Table of Contents
- Contents
- Introduction
- Engine
- Transmission
- Front Axle System
- Rear Axle System
- Hydrostatic Drive
- Brakes and Controls
- Hydraulic Systems
- Frames and Ballasting
- Steering
- Wheels
- Cab Climate Control
- Electrical System
- Dozer blade and arm
- Platform, Cab, Bodywork and Decals
- Specials Tool Index
Manual Extract: Loader bucket control cylinder – Disassemble

2. Drain the engine coolant.
3. Locate the DEF/ADBLUE® Heater Control valve up to Supply Module on the right–hand side of the engine.
4. Disconnect the machine wiring harness (2) from the DEF/ADBLUE® heater control valve.
Using a small flat blade screw driver, pull up on the fitting retaining clip and disconnect the coolant inlet (3) /outlet (5) and by-pass (4) lines from the heater control valve (1)
5. Remove the hexagonal bolts (6) securing heater control valve to the mounting support bracket and remove the heater control valve (1) from machine.


Reviews
There are no reviews yet.