Table of Contents
- Content
- Introduction
- Engine
- Hydraulics System
- Frames and Ballasting
- Tracks and Track Suspension
- Cab Climate Control
- Electrical System
- Booms, dippers and buckets
- Dozer Blade and Arm
- Platform, cab, bodywork and decals
- Special Tools Index
- Electrical Schematic
- Hydraulic Schematic
Manual Extract: Boom lifting cylinder holding valve – Remove

2. Use a wrench [ 17 mm] to remove the bolt (1), and use a wrench [ 36 mm] to remove the line (2).
• Use caps or plugs to cover the HBCV and lines to prevent any entry of water, dust or dirt.
• Clean the HBCV and lines by spraying them with a parts cleaner to prevent scratches and prevent dirt from accumulating on the connectors.
3. Use wrenches [ 27 mm, 36 mm] to remove the line (1).
• Use caps or plugs to cover the HBCV and lines to prevent any entry of water, dust or dirt.
• Clean the HBCV and lines by spraying them with a parts cleaner to prevent scratches and prevent dirt from accumulating on the connectors.
4. Use a wrench [ 17 mm] to remove the 2 bolts (1), and then remove the boom HBCV (2).
• Tightening torque for bolt installation: unknown


1 review for Case CX80C Midi Excavator Service Manual
There are no reviews yet.